Karksi factory
Location: Kivi tn 25, Karksi küla, Mulgi vald, Viljandimaa 69104, Estonia
The Karksi factory features has modern and flexible fully automated production lines (from sorting to sawing, planing and thermofoiling).
- In 2018, the Karksi brewery and winery premises, along with the production building, were acquired.
- In 2022, biomass production lines were automated.
- In 2023, a new production building with an impregnation autoclave and an automatic painting line was completed, and investments were also made in the construction of a loading platform.
At the Karksi factory, we offer several post-processing options: painting, cross-cutting, end-jointing, and impregnation.

Karksi factory in numbers

12 hectares of land are occupied by the factory, auxiliary buildings, and warehouses

Up to 150,000 m³ of planed wood per year

Up to 15,000 tons of wood waste are processed into briquettes and pellets annually

2 planing lines, 2 painting lines, 1 loading platform, 1 impregnation autoclave

100 employees
Näpi factory
Location: Näpi tee 2e, Näpi alev, Rakvere vald, Lääne-Virumaa 44305, Estonia
In 2023, Puidukoda purchased the Stora Enso Näpi sawmill premises, along with the planing and painting line.
In the first half of 2024, the planing line and wood pellet production were launched. In the second half of the same year, the painting line started operating and container loading platform was installed.

Näpi factory in numbers

25 hectares of land are occupied by the factory, auxiliary buildings, and warehouses

Up to 75,000 m³ of planed wood per year

Up to 7,500 tons of wood waste are processed into pellets annually

1 planing line, 1 painting line, 1 loading platform

20 employees